国产在线播-国产在线爱做人成小视频-国产在线h视频-国产在线a免费观看-亚洲国产精品线播放-亚洲国产精品丝袜在线观看

Hello! Welcome to Suzhou Anke Zhongda Purifying Technology Co.,ltd.! HOME | Add favorites | English | 中文版
PRODUCTS LISTS
CONTACT US
For more details, please consult
0512-68249823
0512-68240292-812
13951112621
CONTACT:Mr zhang
Or leave a message for us
NewsLOCATION:HOME >News
How to purchase a return air grille
 Hits:4917 AddTime:2023/6/15 17:39:52
The selection of sewage treatment equipment grids includes the selection of grid section, determination of grid spacing, and selection of grid slag removal methods. The cross-sectional shapes of grid bars include squares, circles, rectangles, and rectangles with semicircles. Circular cross-section bars have good hydraulic conditions, low water flow resistance, but poor stiffness, and generally use rectangular bars. The cross-sectional shape of the grid bars can be selected according to the following table.
Determination of grid bar spacing
1. The clearance of the front grille of the water pump is determined according to the requirements of the water pump. (Refer to P178 Table 6-3 of the teaching material)
2. The determination of the spacing between the front grille of the sewage treatment system is generally as follows: manual slag removal: 25-40mm; Mechanical slag removal: 10-25mm.
3. Determination of slag amount: For domestic sewage, if there is a lack of information, it can be determined according to Table 6-4 of the textbook.
Determination of Design Parameters for Grating of Sewage Treatment Equipment
1. The flow rate of sewage in front of the fence is 0.4-0.9m/s;
2. Flow velocity through the grid: 0.6-1.0m/s;
3. The height difference h1 (head loss) between the bottom of the channel before and after the gate is generally taken as 0.08-0.15m;
4. Grid inclination angle: 45 °~75 °
Operation and Maintenance
For manual slag removal grilles: promptly remove and prevent blockage.
For mechanical slag removal grilles: ensure normal operation. Intermittent cleaning should be equipped with overload automatic protection devices.
Regular inspection and maintenance of all parts of the equipment are required, and maintenance records should be kept.
【Refresh】【Favorites】【Print】 【Close】
Previous:Design Techniques for Lighting System Configuration in Purification Workshop Next:How to use air shower passage and precautions

主站蜘蛛池模板: 久久久久久亚洲精品中文字幕| 欧美日韩大尺码免费专区| 这里有精品视频| 国产l精品国产亚洲区在线观看| 高清国产一区二区| 国产成人精品日本亚洲直播一| 青青青在线视频人视频在线| 国产精品免费观看视频| 国产一区二三区| 成人一级毛片| 99精品久久久久久| 欧美亚洲国产精品| 日韩欧美一区二区精品久久| 亚洲欧美精品伊人久久| 在线福利观看| jizzjizzjⅰzz亚洲美女| 欧美zzzzz免费视频| 人鱼的旋律第一季动漫| 成年网站免费视频黄| 日韩毛片一级| 亚州一级| 日韩中文在线| 99资源在线观看| 日本中文字幕在线| 91亚洲区国产区精品区| 黄色国产在线| 亚洲高清成人| 免费视频网站| 免费在线小视频| 西瓜视频网页版| 国产精品永久在线| 在线视频亚洲欧美| 欧美亚洲国产精品| 日韩伦乱| 国产三级影视| 91精品国产免费入口| 福利在线国产| 日本久久中文字幕| 久久99精品福利久久久| 特黄色一级片| 欧美亚洲国产精品|